阿拉爱上海123vip,南京工作室外卖喝茶,东莞高端私人品茶

Cn

Amazing Chinese infrastructure!
Source:Qufu Juli Release Date:2020-7-15
Read:6

At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed

厉害了中国基建!四座桥梁同步转体 90分钟后“优良牵手”


Amazing Chinese infrastructure! Four bridges rotate synchronously for 90 minutes before 'excellent hand holding'


At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed.


At 0:30 in the morning, four bridges with a total weight of 10000 tons on three lines started rotating synchronously and docked with the opposite line 90 minutes later.


The 'Three Lines and Four Bridges' all pass through the Beijing Shanghai Railway and the Beijing Shanghai High speed Railway on their way to the new airport. In order to avoid affecting the normal operation of these two busy lines and reduce the occupation of existing land, all three lines adopt the structure of elevated bridges.


The successful transformation of the "Three Lines and Four Bridges" marks the official opening of the "throat passage" of the Beijing Daxing International Airport Expressway, laying the foundation for ensuring its completion and opening to traffic in 2019.


主站蜘蛛池模板: 贵港市| 济南市| 黄浦区| 中宁县| 娄底市| 德清县| 淳安县| 公安县| 边坝县| 拉孜县| 珠海市| 江源县| 花垣县| 额尔古纳市| 宣化县| 南华县| 汤阴县| 赣州市| 长汀县| 东丽区| 马关县| 霞浦县| 英吉沙县| 什邡市| 五峰| 定陶县| 红原县| 湘乡市| 望奎县| 梅河口市| 无极县| 都江堰市| 广丰县| 革吉县| 赣榆县| 新密市| 吉安县| 上蔡县| 宜城市| 旌德县| 修文县|