阿拉爱上海123vip,南京工作室外卖喝茶,东莞高端私人品茶

Cn

Amazing Chinese infrastructure!
Source:Qufu Juli Release Date:2020-7-15
Read:6

At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed

厉害了中国基建!四座桥梁同步转体 90分钟后“优良牵手”


Amazing Chinese infrastructure! Four bridges rotate synchronously for 90 minutes before 'excellent hand holding'


At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed.


At 0:30 in the morning, four bridges with a total weight of 10000 tons on three lines started rotating synchronously and docked with the opposite line 90 minutes later.


The 'Three Lines and Four Bridges' all pass through the Beijing Shanghai Railway and the Beijing Shanghai High speed Railway on their way to the new airport. In order to avoid affecting the normal operation of these two busy lines and reduce the occupation of existing land, all three lines adopt the structure of elevated bridges.


The successful transformation of the "Three Lines and Four Bridges" marks the official opening of the "throat passage" of the Beijing Daxing International Airport Expressway, laying the foundation for ensuring its completion and opening to traffic in 2019.


主站蜘蛛池模板: 台中市| 平潭县| 仁寿县| 卓资县| 新津县| 麦盖提县| 黄陵县| 潢川县| 怀远县| 沿河| 榆中县| 新巴尔虎右旗| 滕州市| 荔波县| 佳木斯市| 维西| 吉林市| 汉川市| 漳平市| 大关县| 南部县| 鸡西市| 南宁市| 布拖县| 肃宁县| 五河县| 泉州市| 福鼎市| 黎川县| 加查县| 察雅县| 宁强县| 扶沟县| 达尔| 夹江县| 古浪县| 同仁县| 阿拉尔市| 包头市| 兰考县| 株洲县|